INTRODUCTION
Infrastructure development is our business. For over five decades, Boremaster Limited has satisfied clients by executing projects professionally, economically and within schedule. Be it projects related to water, transport, storage, mineral development, energy, power-generation & transmission, having Boremaster on a project delivers a clear advantage to governments, development agencies and end users.
REPUTATION
Irrespective of the size or complexity of the job client satisfaction is at the heart of what we do as professionals.
Section
We are looking back to a long-term relationship with Boremaster in Turkmenistan…. Boremaster and its local setup became our nominated subcontractors for the pipe installation of the water mains (DN 400 up to DN 1400) and the sewer line including the installation of prefabricated manholes and the valve chambers.
Boremaster offered us the best conditions and services compared to other companies
Boremaster did the job in time and in an acceptable quality. We were also satisfied with their financing situation and standing during the performance of the job.
PWT Wasser- und Abwassertechnik GmbH, GERMANY
Section 1
“…BOREMASTER LIMITED WERE REWARDED DURING THE LAST TWO YEARS BY THE WATER AND POWER DEVELOPMET AUTHORITY (WAPDA), LAHORE, ONE CONTRACT ON NEGOTIATED BASIS AND THE SECOND CONTRACT ON OPEN TENDERING BASIS…. BOREMASTER LIMITED HAVE DRILLED, DEVELOPED AND TESTED 230 TUBEWELLS IN 500 DAYS, CAPACITIES RANGING FROM 900 GPM TO 2000 GPM. THE SCOPE OF THESE CONTRACTS, APART OF INSTALLATION OF COMPLETE TUBEWELLS ALSO INCLUDES CONSTRUCTION OF DISPOSAL WORKS, PUMP HOUSES AND MAINTENANCE STAFF QUARTERS FOR THE TUBEWELLS…”
PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY
Section 2
“THIS IS TO CERTIFY THAT MESSRS. BOREMASTER, LAHORE, HAVE COMPLETED 37 NOS. 30 TONS PILES ON SCHEDULE…. DUE TO THE EXCELLENT QUALITY OF THEIR PERFORMANCE NO LOADING TEST ON THE PILES WAS CONSIDERED NECESSARY…”
PIKON LIMITED
Section
“YOUR REQUEST TO USE M/S BOREMASTER (SAUDI ARABIA) LTD.
AS A SUBCONTRACTOR IN CONJUNCTION WITH CONSTRUCTION
OF DRILLED FOUNDATION PIERS IN AREA 2 AND 5 IS APPROVED…”
DEPT. OF ARMY, AL MATIN DISTRICT, CORPS OF ENGINEERS, NEW YORK. U.S.A.
Section
“… APPROVAL HAS BEEN RECEIVED FOR THE FOLLOWING CONTRACTORS..: BOREMASTER (SAUDI ARABIA) LTD…”
DEPT. OF ARMY, AL MATIN DISTRICT, CORPS OF ENGINEERS, NEW YORK. U.S.A
Section
“WE HAVE PLEASURE IN CERTIFYING THAT M/S BOREMASTER (S.A.) LTD., .. HAVE PERFORMED AS PER OUR SCHEDULE OF CONSTRUCTION, THE DRILLING AND CONCRETING OF 5636 PIERS FOR FOUNDATION OF FAMILY HOUSING AREA 1 & 3 AT KING KHALED MILITARY CITY… THEY ALSO PERFORMED LOAD TESTS AS PART OF THE CONTRACT….. THEIR EQUIPMENT FUNCTIONED WITHOUT ANY BREAKDOWN AND DEMONSTRATED THE CAPACITY IN EXCESS OF STIPULATED SCHEDULE.
AL-HUSSEINE – ADA (SAUDI ARABIA) LTD.
Section
“IT IS OUR PLEASURE TO RECOMMEND BOREMASTER (SAUDI ARABIA)
LTD. WHICH HAD COMPLETED THE SUBCONTRACT OF DRILLING FOR PIER FOUNDATION PERFECTLY AND CONTRIBUTED TO OUR SUCCESSFUL EXECUTION OF AREA 8 AND 12, FAMILY AND INDUSTRIAL FACILITIES, PHASE II PROJECT (CONTRACT AMOUNT: AREA 8 & 12 PH (II) USD 225,000,000.00) IN KING KHALID MILITARY CITY..”
SAMWHAN CORPORATION SOUTH KOREA
Section
“WE ARE PLEASED TO RECOMMEND TO YOU BOREMASTER LTD…
BOREMASTER (SAUDI ARABIA) WAS AWARDED THE SUBCONTRACT
OF DRILLED PIER FOUNDATION WORK FOR AREA 4, FAMILY HOUSING
AND AREA 15, SUPPORT FACILITIES IN THE KING KHALID MILITARY
CITY… BOREMASTER (SAUDI ARABIA) HAS COMPLETED THE ENTIRE JOB WITHIN 50% OF THE SCHEDULED TIME PERIOD IN ACCORDANCE
WITH THE U.S. ARMY CORPS OF ENGINEER’S SPECIFICATIONS…”
SAMWHAN/KEANGNAM JV, SOUTH KOREA
Section
“WE ARE PLEASED TO CERTIFY THAT M/S BOREMASTER LTD… HAVE COMPLETED SIXTY NUMBER, 20 TONS BORED PILES BY REVERSE CIRCULATION METHOD IN 28 DAYS TIME… THEIR SCHEDULE, QUALITY OF WORK WAS SATISFACTORY AND LOAD TEST WAS NOT CONSIDERED NECESSARY…”
THE MULTAN ELECTRIC SUPPLY CO., LTD. PAKISTAN
Section
“CERTIFIED THAT M/S BOREMASTER LTD. HAVE COMPLETED DRILLING OF 110 NO. TEST BORE HOLES IN SALINE ZONE AREA OF SCARP-2 ONE MONTH AHEAD OF THE SCHEDULED COMPLETION PERIOD…”
PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY
Section
“THIS IS TO CERTIFY THAT BOREMASTER DRILLED 48 FIFTY FIVE FOOT DEEP PILES AT THE DAWOOD HERCULES СHEMICALS… HAVE COMPLETED THE PILES TO OUR SATISFATION AND IN THE TIME ALLOWED IN OUR SCHEDULE…”
TRANS PAKISTAN ENGINEERING LTD.
Section
“THIS IS OUR PLEASURE TO CERTIFY THAT MESSRS BOREMASTER, LAHORE HAVE COMPLETED 282 NOS 50 TONS PILES IN 60 DAYS FOR THE GRAIN SILO PROJECT… TWO PILES, INDICATED BY US WERE SUBJECTED TO 100 LONG TONS LOAD TEST (TWO TIMES THE WORKING LOAD) WITH A NET SETTLEMENT OF 3.06 MM AND 3.28 MM WHICH IN OUR OPPINION IS EXCELLENT WHEN VIEWED WITH RESPECT TO THE RELEVANT ASTM SPECIFICATIONS…”
INTERNATIONAL CONSULTANTS CONSORTIUM LTD.
Section
“I can recommend Boremaster for successfully completing the project on time and within cost”
GAC Marine S.A. Turkmenistan
.